FAA AD 2026-14-01: Bombardier BD-700-2A12 (Global 7500) Slat Cove Rib Fasteners — Third BD-700 AD This Year

Business jet wing leading edge and slat structure, representing FAA AD 2026-14-01 slat cove rib bracket fastener inspection requirement for Bombardier BD-700-2A12 Global 7500`

Quick Answers What does FAA AD 2026-14-01 require for Bombardier Global 7500 operators? FAA AD 2026-14-01, effective August 14, 2026, requires a general visual inspection of fasteners on slat 2 cove rib 6 brackets on certain Bombardier BD-700-2A12 (Global 7500) aircraft. Reports of missing or under-torqued fasteners at this location prompted the AD. On-condition corrective … Read more

Categories FAA

FAA AD 2026-14-06: CFM LEAP-1A HPT Blade Inspections Extended to South Asia Region — Effective July 27, 2026

Jet engine HPT section borescope inspection in MRO hangar, representing FAA AD 2026-14-06 HPT rotor stage 1 blade inspection requirements for CFM LEAP-1A engines operating in South Asia`

Quick Answers What does FAA AD 2026-14-06 require for CFM LEAP-1A engines? FAA AD 2026-14-06, effective July 27, 2026, supersedes AD 2025-21-03 and requires initial and repetitive borescope inspections of HPT rotor stage 1 blades on LEAP-1A engines that have accumulated more than 1,100 South Asia takeoffs. South Asia is defined as Bangladesh, Bhutan, India, … Read more

Categories FAA

FAA AD 2026-13-15: 5G Canadian Airspace Limitations Now Cover Boeing 707, 717, 727, DC-8, DC-9, DC-10, MD-11, and MD-80/90 Series

Classic-era commercial aircraft on cargo ramp, representing FAA AD 2026-13-15 5G Canadian airspace limitations for legacy Boeing 707, 727, DC-9, DC-10, and MD-series aircraft`

Quick Reading Which legacy Boeing and McDonnell Douglas aircraft are covered by FAA AD 2026-13-15? FAA AD 2026-13-15, effective July 1, 2026, covers Boeing 707, 717, 727, DC-8, DC-9, DC-10, MD-11, and MD-80/87/88/90-30 series aircraft. It requires AFM Limitations revisions for most variants, with MD-81, MD-82, MD-83, MD-87, MD-88, and MD-90-30 also requiring an AFM … Read more

Categories FAA

FAA AD 2026-10-14: Boeing 747 SATCOM Antenna Adapter Plate Corrosion — Repetitive Inspections Required

Boeing 747 four-engine widebody aircraft on airport apron, representing FAA AD 2026-10-14 SATCOM antenna adapter plate corrosion inspection requirement`

Quick Reading What does FAA AD 2026-10-14 require for Boeing 747 operators? FAA AD 2026-10-14, effective July 6, 2026, requires repetitive detailed inspections of the SATCOM high-gain antenna adapter plate on all Boeing 747-100 through 747-400 series aircraft for corrosion. If corrosion is found, corrective actions must be completed on condition. All 747 variants except … Read more

Categories FAA

FAA AD 2026-10-15: Airbus A318/A319/A320/A321 Forward Pressure Bulkhead Inspections — Effective July 6, 2026

Airbus single-aisle narrow-body aircraft in cruise flight, representing FAA AD 2026-10-15 on forward pressure bulkhead inspections for the A318/A319/A320/A321 family`

Quick Answer What does FAA AD 2026-10-15 require for Airbus A320 family aircraft? FAA AD 2026-10-15, effective July 6, 2026, requires repetitive special detailed inspections and rototest or HFEC inspections of fasteners and fastener holes at the forward pressure bulkhead of certain A318, A319, A320, and A321 aircraft. The AD addresses a cold working process … Read more

Categories FAA

FAA AD 2026-13-11: Boeing 787 Dreamliner 5G Canadian Airspace Limitations — Effective July 1, 2026

Large widebody commercial aircraft on final approach, representing FAA AD 2026-13-11 on Boeing 787 radio altimeter limitations in Canadian 5G airspace`

What does FAA AD 2026-13-11 require for Boeing 787 operators flying to Canada? FAA AD 2026-13-11, effective July 1, 2026, requires operators of non-radio altimeter-tolerant Boeing 787-8, 787-9, and 787-10 aircraft to revise both the AFM Limitations Section and the AFM Operating Procedures Section before further flight in Canadian airspace, due to 5G Lower C-Band … Read more

Categories FAA

FAA AD 2026-13-06: Rolls-Royce Trent XWB Fuel Manifold Hose Inspection Now Repetitive — Effective July 17, 2026

Large twin-engine widebody aircraft on airport apron at dusk, representing FAA AD 2026-13-06 on Rolls-Royce Trent XWB fuel manifold hose inspections for Airbus A350 operators`

What does FAA AD 2026-13-06 require for Rolls-Royce Trent XWB engines? FAA AD 2026-13-06, effective July 17, 2026, requires visual and dimensional inspections of the main fuel hose assembly of the fuel manifold on Trent XWB-75, -79, -79B, -84, and -97 engines. Inspections are repetitive for certain engine groups. The AD supersedes AD 2024-25-10, which … Read more

Categories FAA

FAA AD 2026-13-13: Boeing 737 Classic and NG Family Now Subject to 5G C-Band Canadian Airspace Limitations

Commercial narrow-body aircraft on final approach in overcast conditions, representing FAA AD 2026-13-13 radio altimeter limitations for Boeing 737 Classic and NG operations in Canadian airspace`

Does the 737 NG have its own 5G Canadian airspace AD separate from the MAX? Yes. FAA AD 2026-13-13, effective July 1, 2026, applies specifically to the Boeing 737 Classic and Next Generation family — 737-100 through 737-900ER. A separate AD covers the 737 MAX family. Both require AFM revisions limiting radio altimeter-dependent operations in … Read more

Categories FAA

FAA Issues Emergency Radio Altimeter ADs for Canadian Airspace — Effective July 1, 2026

Commercial aircraft on final approach over urban area with telecommunications infrastructure, representing FAA 5G C-Band radio altimeter airworthiness directives for Canadian airspace`

What do the FAA 5G radio altimeter ADs require for Canadian airspace? FAA ADs 2026-13-02 and FAA-2026-7208, effective July 1, 2026, require operators to revise their Airplane Flight Manual to incorporate limitations on certain operations that depend on radio altimeter data when flying in Canadian airspace, where 5G Lower C-Band interference protections were reduced from … Read more

Categories FAA